The remodel timeline.
Choose the scope, the cabinet type and a start date and see design, ordering, demolition, installation and finish by the week, with the days your kitchen is out of service. Free, with no signup.
- Week-by-week phases
- Out-of-service days
- Free, no signup

Good to know
- Cabinet lead times often decide when construction can start.
- Windows of weeks are typical ranges. Your written schedule has the real dates.
Saved. Your choices will travel with the estimate form below.
Four things behind every timeline.
Cabinet lead time
Custom and semi-custom cabinets often take weeks to arrive, which sets the start date.
Permits
Review times vary by city and county.
Layout changes
Moving plumbing, gas or walls adds rough-in and inspection steps.
Selections
Late changes to counters, tile or fixtures delay ordering.
Learn more about each one.
44Planning, Permits and SpecialtyRemodel Project ManagementSomeone to keep it all moving.
43Planning, Permits and SpecialtyKitchen Permits and InspectionsDone properly, on the record.
01Full Kitchen RemodelsFull Kitchen RemodelingEverything planned together.
10CabinetsCabinet InstallationPerfectly level. Perfectly aligned.
02Full Kitchen RemodelsKitchen Design and PlanningDraw it before you build it.
48Planning, Permits and SpecialtyRental and Sale-Ready Kitchen RefreshMaximum impact, minimum downtime.Remodel Timeline questions
How long does a kitchen remodel take?
After design and ordering, many full remodels take several weeks of construction. Cabinet lead times can add weeks before that. You get a written schedule at the start and updates when anything changes. Our Remodel Timeline shows typical windows.
Can I stay in my home during the remodel?
Yes. Most families do. We protect the rest of the house with dust walls and floor covering, clean up each day and help you plan a temporary kitchen with a microwave, small refrigerator and a place to wash dishes.
Do you handle permits and inspections?
Yes. Moving walls, plumbing, gas or electrical usually needs permits, and we prepare and manage them with your city or county, and schedule inspections at the right stages.
Need a date that works?
Tell us your deadline and we will fit the schedule around it.